Browse our collection of papers in
John Deere Component Works (JDCW)

Select number of records per page:  

S/F/131. Consultation analysis of John Deere Component Works costing structure

WORDS:
1000
DATE:
2007
PRICE:
19.99 GBP

The paper is based on John Deere Component Works case study by Robert Steven Kaplan and Artemis March. The paper examines the current costing methods at the John Deere Component Works (JDCW) identifying the factors behind their failure, and recommending to introduce an Activity Based Costing (ABC) system.

 

KEYWORDS: Cost, John Deere Component Works, Activity Based Costing, ABC,