Browse our collection of papers in
BAA

Select number of records per page:  

C/P/524. UK Air Transport Policy and Planning

WORDS:
2150
DATE:
2012
PRICE:
29.99 GBP

The paper looks at the importance of air transport examining resources that can be used to increase passenger and freight volumes, and considering the initiative of the British Airports Authority (BAA) to expand Heathrow and Stansted airports. The ability of the coalition government to continue the new air transport policy is argued.

 

KEYWORDS: UK Air Transport, Policy and Planning, British Airports Authority, BAA, Heathrow, Stansted,

 

C/HR/1213. Dissertation. A critical examination of selection and recruitment processes carried out in the aviation industry. Case study BAA

WORDS:
15100
DATE:
2012
PRICE:
159.99 GBP

This dissertation focuses on recruitment in reference to the BAA, and begins by providing background information on the airplane organisation. The study aims to Identify the various selection and recruitment approaches followed at BAA and to explore the various employee retention strategies existing at BAA such as appraisals and rewards among others. The review of literature examines the concept of selection and recruitment, as well as general human resource issues in the aviation industry. The methodology is then discussed, and the study outlines the data collection methods as well as the ethical considerations. The dissertation then highlights the findings, and concludes with recommendations, an evaluation of the limitations of the study, and the scope for future research.

 

KEYWORDS: Dissertation, recruitment, BAA, airplane, aviation industry, selection, retention!,

 

C/M/1406. Project management of Terminal 5, Heathrow

WORDS:
4550
DATE:
2010
PRICE:
49.99 GBP

The paper examines the techniques of project management used in Terminal 5 development by the British Airports Authority (BAA), the owner and operator of Heathrow airport. The background of the Terminal 5 project is described including its planning, design, and construction phases, critical success factors for the project implementation are identified presenting an overview of BAA project structure, methods, risks, etc.

 

KEYWORDS: Project management, Terminal 5, Heathrow, British Airports Authority, BAA,

 

S/M/494. What steps should BAA take to relaunch itself as a strong customer focused service provider?

WORDS:
5400
DATE:
2009
PRICE:
59.99 GBP

The paper reports on the strategy used by the British Airports Authority (BAA) in implementing change in the operations management and infrastructure of UK airports discussing their integrated strategic project, performing BAA's SWOT analysis, and suggesting recommendations about various aspects of change management.

 

KEYWORDS: BAA, British Airports Authority, change management, SWOT,

 

S/B/503. SWOT analysis of BAA

WORDS:
950
DATE:
2009
PRICE:
9.99 GBP

This paper presents overview of BAA and SWOT Analysis which is analysing strengths, weaknesses, opportunities and threats of BAA.

 

KEYWORDS: BAA, SWOT,

 

S/A/26. Airport Terminal Design and Innovation – power point presentation

WORDS:
0
ADD-ONS:
28 Slides
DATE:
2008
PRICE:
19.99 GBP

The paper is a PowerPoint presentation on the design of an airport terminal outlining its functions, layout, facilities and services. A description of the Dublin Airport and Stansted Airport is presented comparing the features of both terminals.

 

KEYWORDS: Airport, terminal, design, Dublin Airport, Stansted,

 

S/F/187. Strategic Financial Management: BAA Valuation

WORDS:
3500
DATE:
2008
PRICE:
39.99 GBP

The paper addresses the issues of financial management examining the value of British Airport Authority (BAA) from the perspective of the bidder. An overview of BAA performance since 2000 is presented, analysis is conducted using the valuation methods of Net Asset Value (NAV), Price Earnings Multiples (P/E ratio) and Discounted Cash Flow (DCF). The values yielded from each method are compared, defence tactics used by BAA to maximise premium from the bidder are described, potential risks and bidder strategies are discussed.

 

KEYWORDS: f, strategic, financial, management, baa, valuation,